Heathcote Road Bridge Widening – Linden St Section

Sutherland, NSW

Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (1)
Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (2)
Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (3)
Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (4)
Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (5)
Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (6)
Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (1) Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (2) Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (3) Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (4) Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (5) Wexcon-Construction-Project-Heathcote-Road-Bridge-Widening (6)

Project Overview:

The Linden Street corridor connecting Bangor Bypass to Princes Highway is a crucial east-west link used by over 6,000 vehicles and 500 bus passengers per hour at peak times across the Sutherland Shire and Greater Sydney.

To bolster this key connection, Transport for NSW has upgraded three vital
intersections:

  • River Road and Linden Street
  • Linden Street and Leonay Street
  • Linden Street and The Grand Parade

The targeted improvements will help keep people moving as Linden Street continues serving as an integral local and regional transport artery.

Our Role

Wexcon provided specialised concrete crews for day and night kerbing and paving scope including:

  • Concrete footpaths, driveways, medians, pram ramps
  • Kerbing, retaining wall footings
  • Stormwater pit risers

Our expertise in completing diverse concrete works showcases capabilities across vital streetscape, stormwater, and associated infrastructure projects.

Project details:

Client:Transport for NSW (TfNSW)
Principal Contractor:Fulton Hogan Construction
Timeline:May 2023 – September 2023
Project value:$285,000.00

Testimonial:

Wexcon were engaged by the Heathcote Road Bridge & Linden Street Upgrade Alliance to deliver the streetscape concreting works. The works were widely varying from pit builds, kerbings with lintels, driveways, pram ramps, islands and footpaths, dynamic and complex in access and staged for traffic management due to live road working requirements, with the vast majority of works also being conducted at night. Wexcon arrived to site with a positive and cooperative attitude every shift, went above and beyond for specific night shift PPE requirements and delivered a high class finish of work on every item executed. All client representatives were pleased with Wexcon’s performance and demeanour, with special praise for their night shift site foreman being emphasised. From an engineering perspective, their management team is also quick to assist to resolve any issues and are very accessible and professional. They have been a highly rated subcontractor for the project.

Forming
Australia’s Future.

Let’s connect to discuss how we can add immense value to your next project.

Forming
Australia’s Future.

Let’s connect to discuss how we can add immense value to your next project.